SUBSITE Electronics, CCTV Mainline Inspection equipment installed in (customer provided chassis Ford Transit-350 Hi roof extended length either Gasoline or Diesel engine) Basic interior cabinetry and finishing, Lonseal Flooring in equipment room, either 7.0 Kw gas generator or 6.3 Kw Mobile Power System (MEPS) inverter system , 12 volt charging system, Safety exterior lighting, 9200 Btu A/C and wall mounted heater in control room, Operator chair, TrakSTAR LED Zoom Camera with Internal Diagnostic, Steerable wheeled TranSTAR Transporter with Rear View Camera to inspect 6” to 30” pipe, Wheel Sets, Rack mounted mainline Power Control Unit (PCU), Text Writer and Footage Overlay, 19” LCD video/computer monitor, 19” flat Screen in equipment room. Joystick and Handheld controller, Mainline Cable Reel with drop down cable guide system, 1500' Single Conductor double armored cable. Wash down equipment, Maintenance kit, Test Cables, Down-hole equipment, Two (2) days training, Additional equipment from Published Options.
The Charles Machine Works, Inc.
SC21AG050
SC01-21A Sewer Cleaning, Hydro-Evacuating, Inspection Equipment, & Miscellaneous Services
Public Works Equipment
$130,866.14
Each
CCTV Mainline equipment installed
Chris Remillard
[email protected]
Phone: 800-767-1974
Fax: 707-676-8051
[email protected]
Phone: 713-993-2486
Fax: 713-993-4548